Please find below, for the BGS-RSCP Auction:
- the tranche target for each EDC;
- the statewide load cap;
- the load cap for each EDC; and
- the size and MW-measure for each tranche.
A tranche target is the number of tranches needed for a given EDC at the beginning of the Auction. There is a statewide load cap of 20 tranches, which is the maximum number of tranches that a bidder can bid in the Auction and serve statewide. There is an EDC Load Cap for each EDC, which is a maximum number of tranches for the EDC that a bidder can bid in the Auction and serve for that EDC.
|
EDC
|
Total
RSCP Peak Load
Share (MW)
|
2026 Auction RSCP Peak Load Share (MW)
|
Tranche Target
|
EDC Load Cap
|
Tranche Size (%)
|
MW-Measure
|
|
PSE&G
|
7,887.62
|
2,598.40
|
28
|
13
|
1.18%
|
92.80
|
|
JCP&L
|
5,000.90
|
1,365.30
|
15
|
7
|
1.82%
|
91.02
|
|
ACE
|
2,254.70
|
819.92
|
8
|
3
|
4.55%
|
102.49
|
|
RECO
|
340.20
|
170.10
|
2
|
2
|
25.00%
|
85.05
|
|
Total
|
15,483.42
|
4,953.72
|
53
|
-
|
-
|
-
|
For the BGS-RSCP Auction, the statewide minimum starting price will be 17.00¢/kWh and the statewide maximum starting price will be 21.50¢/kWh.
In the first round of the BGS-RSCP Auction, prices will be set no lower than the minimum starting price and no higher than the maximum starting price. In their Part 2 Applications, Qualified Bidders will submit indicative offers at the maximum starting price and at the minimum starting price. Please see the BGS-RSCP Auction Rules for further details.
November 14, 2025.
|