Please find below, for the BGS-RSCP Auction:
- the tranche target for each EDC;
- the statewide load cap;
- the load cap for each EDC; and
- the size and MW-measure for each tranche.
A tranche target is the number of tranches needed for a given EDC at the beginning of the Auction. There is a statewide load cap of 21 tranches, which is the maximum number of tranches that a bidder can bid in the Auction and serve statewide. There is an EDC Load Cap for each EDC, which is a maximum number of tranches for the EDC that a bidder can bid in the Auction and serve for that EDC.
| EDC | Total RSCP Peak Load Share (MW) | 2027 Auction RSCP Peak Load Share (MW) | Tranche Target | EDC Load Cap | Tranche Size (%) | MW-Measure |
| PSE&G | 7,909.22 | 2,698.45 | 29 | 14 | 1.18% | 93.05 |
| JCP&L | 5,001.83 | 1,930.80 | 20 | 9 | 1.93% | 96.54 |
| ACE | 2,241.40 | 713.16 | 7 | 3 | 4.55% | 101.88 |
| RECO | 344.40 | 86.10 | 1 | 1 | 25.00% | 86.10 |
| Total | 15,496.85 | 5,428.51 | 57 | - | - | - |
For the BGS-RSCP Auction, the statewide minimum starting price will be 17.50¢/kWh and the statewide maximum starting price will be 22.00¢/kWh.
In the first round of the BGS-RSCP Auction, prices will be set no lower than the minimum starting price and no higher than the maximum starting price. In their Part 2 Applications, Qualified Bidders will submit indicative offers at the maximum starting price and at the minimum starting price. Please see the BGS-RSCP Auction Rules for further details.